The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 17, 2021

Filed:

Jan. 02, 2019
Applicant:

Bloom Energy Corporation, Sunnyvale, CA (US);

Inventor:

Carl Cottuli, Franklin, MA (US);

Assignee:

BLOOM ENERGY CORPORATION, San Jose, CA (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G01R 31/374 (2019.01); H01M 8/04701 (2016.01); G01R 31/378 (2019.01); H01M 8/0432 (2016.01); G01R 31/3828 (2019.01); H01M 8/04828 (2016.01); H01M 8/04537 (2016.01);
U.S. Cl.
CPC ...
G01R 31/374 (2019.01); G01R 31/38 (2019.01); G01R 31/3828 (2019.01); H01M 8/0432 (2013.01); H01M 8/0494 (2013.01); H01M 8/04365 (2013.01); H01M 8/04619 (2013.01); H01M 8/04626 (2013.01); H01M 8/04701 (2013.01); H01M 8/04731 (2013.01); H01M 8/04947 (2013.01);
Abstract

Various embodiments manage a fuel cell IT grid system to maintain fuel cell temperatures above a threshold temperature. The system may include power modules each including a fuel cell, DC/DC converters each connected to a power module, a DC power bus connected to the DC/DC, IT loads each connected to the DC power bus, a load balancing load connected to the DC power bus, and a control device connected to a first power module. The control device may determine whether a temperature of the first power module exceeds the temperature threshold, determine whether an electrical power output of the power modules exceeds an electrical power demand of the IT loads in response to the temperature exceeding the temperature threshold, and direct excess electrical power output to the load balancing load in response to the electrical power output exceeding the electrical power demand.


Find Patent Forward Citations

Loading…