The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 01, 2021

Filed:

May. 08, 2018
Applicant:

Johnson Controls Technology Company, Auburn Hills, MI (US);

Inventors:

Mohammad N. ElBsat, Milwaukee, WI (US);

Michael J. Wenzel, Grafton, WI (US);

Nicole A. Madison, Milwaukee, WI (US);

Tricia J. Valentine, Glendale, WI (US);

Collin W. Eggert, Milwaukee, WI (US);

Matthew J. Asmus, Watertown, WI (US);

James P. Kummer, Wales, WI (US);

Carol T. Tumey, Wauwatosa, WI (US);

Peter A. Craig, Pewaukee, WI (US);

Assignee:

Johnson Controls Technology Company, Auburn Hills, MI (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G05D 3/12 (2006.01); G05D 5/00 (2006.01); G05D 9/00 (2006.01); G05D 11/00 (2006.01); G05D 17/00 (2006.01); G05B 19/042 (2006.01); G06Q 30/02 (2012.01); G06Q 50/06 (2012.01); G05B 15/02 (2006.01); H02J 3/38 (2006.01); H02J 3/32 (2006.01); H02J 3/00 (2006.01);
U.S. Cl.
CPC ...
G05B 19/042 (2013.01); G05B 15/02 (2013.01); G06Q 30/0236 (2013.01); G06Q 50/06 (2013.01); G05B 2219/2639 (2013.01); H02J 3/003 (2020.01); H02J 3/32 (2013.01); H02J 3/383 (2013.01); H02J 2203/20 (2020.01);
Abstract

An energy optimization system for a building includes a processing circuit configured to generate a user interface including an indication of one or more economic load demand response (ELDR) operation parameters, one or more first participation hours, and a first load reduction amount for each of the one or more first participation hours. The processing circuit is configured to receive one or more overrides of the one or more first participation hours from the user interface, generate one or more second participation hours, a second load reduction amount for each of the one or more second participation hours, and one or more second equipment loads for the one or more pieces of building equipment based on the received one or more overrides, and operate the one or more pieces of building equipment to affect an environmental condition of the building based on the one or more second equipment loads.


Find Patent Forward Citations

Loading…