The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 27, 2021

Filed:

Apr. 10, 2018
Applicant:

Doosan Infracore Co., Ltd., Incheon, KR;

Inventor:

Byung Il Kang, Incheon, KR;

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
E02F 9/22 (2006.01); F15B 11/024 (2006.01); F15B 21/14 (2006.01); F15B 1/02 (2006.01);
U.S. Cl.
CPC ...
E02F 9/2217 (2013.01); E02F 9/2221 (2013.01); E02F 9/2267 (2013.01); F15B 1/02 (2013.01); F15B 11/024 (2013.01); F15B 21/14 (2013.01); E02F 9/2296 (2013.01); F15B 2211/20523 (2013.01); F15B 2211/20546 (2013.01); F15B 2211/212 (2013.01); F15B 2211/3058 (2013.01); F15B 2211/6336 (2013.01); F15B 2211/75 (2013.01); F15B 2211/761 (2013.01); F15B 2211/88 (2013.01);
Abstract

A hydraulic system of construction machinery includes: a boom cylinder divided; a first boom hydraulic line serving to supply a hydraulic oil to the boom cylinder during an ascending operation of a boom; a second boom hydraulic line serving to supply the hydraulic oil to the boom cylinder during a descending operation of the boom; a regeneration line serving so that the hydraulic oil discharged from the head side of the boom cylinder flows during the descending operation of the boom; a circulation line connected to the second boom hydraulic line; an accumulator connected to the regeneration line and serving to accumulate the hydraulic oil discharged from the boom cylinder; a boom regeneration valve including a first regeneration spool and a second regeneration spool; and a control unit serving to adjust opening areas of the first regeneration spool and the second regeneration spool during the descending operation of the boom.


Find Patent Forward Citations

Loading…