The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 06, 2021

Filed:

Jan. 11, 2018
Applicant:

Emerson Climate Technologies, Inc., Sidney, OH (US);

Inventors:

Michael A. Saunders, Sidney, OH (US);

Rajan Rajendran, Centerville, OH (US);

Kurt Knapke, Minster, OH (US);

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F25D 29/00 (2006.01); F25B 1/10 (2006.01); F25B 7/00 (2006.01); F25B 41/04 (2006.01); F25B 43/02 (2006.01); F25B 49/02 (2006.01); F25B 5/02 (2006.01); F25B 40/00 (2006.01);
U.S. Cl.
CPC ...
F25D 29/008 (2013.01); F25B 1/10 (2013.01); F25B 5/02 (2013.01); F25B 7/00 (2013.01); F25B 41/04 (2013.01); F25B 43/02 (2013.01); F25B 49/02 (2013.01); F25B 40/00 (2013.01); F25B 41/043 (2013.01); F25B 2400/0401 (2013.01); F25B 2400/075 (2013.01); F25B 2400/13 (2013.01); F25B 2400/22 (2013.01); F25B 2600/2501 (2013.01); F25B 2600/2513 (2013.01); F25B 2700/197 (2013.01); F25B 2700/21152 (2013.01); F25D 2400/14 (2013.01); F25D 2400/36 (2013.01); F25D 2700/10 (2013.01);
Abstract

A refrigeration system includes first and second compressors, a condenser, first and second evaporators, and a valve. The first compressor is fluidly connected to first suction and discharge lines. The second compressor is fluidly connected to second suction and discharge lines. The second suction line is fluidly connected to the first discharge line. The condenser receives refrigerant from the second compressor. The first evaporator receives refrigerant from the condenser and discharges refrigerant to the first suction line. The second evaporator receives refrigerant from the condenser and discharges refrigerant to the second suction line. The valve is disposed between the first evaporator and the first suction line. The first suction line receives refrigerant when the valve is in a first position. The second suction line receives refrigerant when the valve is in a second position. The first compressor is bypassed when the valve is in the second position.


Find Patent Forward Citations

Loading…