The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 06, 2021

Filed:

Jun. 23, 2017
Applicant:

Seaboard International, Inc., Houston, TX (US);

Inventors:

Duc Thanh Tran, Spring, TX (US);

Matthew Thomas Robinson Webster, Edmonton, CA;

Ray Dicksang Pang, Missouri City, TX (US);

Keith Murdoch, Houston, TX (US);

Assignee:

Seaboard International, LLC, Fort Worth, TX (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
E21B 33/068 (2006.01); F04B 15/02 (2006.01); F04B 23/04 (2006.01); F04B 47/00 (2006.01); E21B 33/038 (2006.01); E21B 43/26 (2006.01); F16K 5/04 (2006.01); F16K 11/048 (2006.01); F16K 31/126 (2006.01); B01F 3/08 (2006.01); B01F 7/00 (2006.01); F04B 23/06 (2006.01); F16L 41/03 (2006.01); F16K 5/00 (2006.01); F16K 11/00 (2006.01);
U.S. Cl.
CPC ...
E21B 33/068 (2013.01); B01F 3/0853 (2013.01); B01F 7/00008 (2013.01); E21B 33/038 (2013.01); E21B 43/26 (2013.01); F04B 15/02 (2013.01); F04B 23/04 (2013.01); F04B 23/06 (2013.01); F04B 47/00 (2013.01); F16K 5/04 (2013.01); F16K 11/048 (2013.01); F16K 31/126 (2013.01); F16L 41/03 (2013.01); B01F 2215/0081 (2013.01); F16K 5/00 (2013.01); F16K 11/00 (2013.01);
Abstract

A method and apparatus according to which a hydraulic fracturing fluid is communicated to a wellhead, the apparatus including a fracturing tree connected to the wellhead and into which the hydraulic fracturing fluid is adapted to flow, a fluid conduit connected to the fracturing tree and through which the hydraulic fracturing fluid is adapted to flow before flowing into the fracturing tree, the fluid conduit defining a straight fluid flow path, and a zipper module connected to the fluid conduit and out of which the hydraulic fracturing fluid is adapted to flow before flowing through the fluid conduit. The hydraulic fracturing fluid flows along the straight fluid flow path of the fluid conduit upon flowing out of the zipper module, and continues to so flow along the straight fluid flow path until the hydraulic fracturing fluid flows into the fracturing tree.


Find Patent Forward Citations

Loading…