The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Mar. 23, 2021
Filed:
Jul. 30, 2019
China University of Petroleum (East China), Qingdao, CN;
Chuanliang Yan, Qingdao, CN;
Xiaorong Li, Qingdao, CN;
Xu Ren, Qingdao, CN;
Yuanfang Cheng, Qingdao, CN;
Zhongying Han, Qingdao, CN;
Yang Li, Qingdao, CN;
Jia Wei, Qingdao, CN;
Benjian Song, Qingdao, CN;
Wanqing Tian, Qingdao, CN;
CHINA UNIVERSITY OF PETROLEUM (EAST CHINA), Qingdao, CN;
Abstract
Disclosed are a device and a method of drilling a hydrate micro-borehole and performing fast completion, which belongs to the technical field of a hydrate extraction device and a hydrate extraction method. The method includes a continuous operation machine, a power control mechanism, a high pressure water jet pump, a guider, a continuous pipe, a parent pipe and a child pipe, the parent pipe is connected with the continuous operation machine, and an end of the child pipe is connected with a water jet nozzle; the working method basically includes the following: firstly, a large main borehole is formed by drilling to a destination layer at one time with a large size drill bit; secondly, a horizontal micro-borehole is drilled in a natural gas hydrate reservoir by a high pressure water jet device formed by the child and parent pipes and then the child pipe is heated to enable its skin to fall off and leave a screen; finally, the child and parent pipes are disconnected to perform well completion. The present disclosure is applicable to different natural gas hydrate extraction manners. In this way, well drilling and completion is integrated, sand production is effectively inhibited, and the production of the hydrate reservoir is increased with a small effect on the hydrate reservoir. Thus, drilling is accelerated.