The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 02, 2021

Filed:

Feb. 08, 2019
Applicants:

Arizona Public Service Company, Phoenix, AZ (US);

Powersecure, Inc., Wake Forest, NC (US);

Inventors:

David G. Morton, Chandler, AZ (US);

John E. Pinho, Gilbert, AZ (US);

Mark Martyak, Raleigh, NC (US);

Assignees:

Arizona Public Service Company, Phoenix, AZ (US);

Powersecure, Inc., Wake Forest, NC (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G05B 19/042 (2006.01); H02J 3/38 (2006.01); H02J 3/14 (2006.01); G05F 1/66 (2006.01); H02J 3/32 (2006.01); H02J 3/48 (2006.01);
U.S. Cl.
CPC ...
G05B 19/042 (2013.01); G05F 1/66 (2013.01); H02J 3/32 (2013.01); H02J 3/38 (2013.01); H02J 3/383 (2013.01); H02J 3/48 (2013.01); G05B 2219/2639 (2013.01);
Abstract

Methods and apparatus for power generation and distribution according to various aspects of the present invention may operate in conjunction with a control system for controlling electrical power flowing between a main electrical grid providing main electrical grid power having a frequency, a supplemental power system, and a load. The control system may operate in conjunction with a switch system, wherein the switch system selectively connects the supplemental power system to the main electrical grid. A controller may be responsive to the main electrical grid power frequency and control the switch system. The controller may compare the main electrical grid power frequency to a first threshold and autonomously cause the switch system to connect the supplemental power system to the main electrical grid in response to the frequency of the main electrical grid power crossing the first threshold.


Find Patent Forward Citations

Loading…