The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 02, 2021

Filed:

Jun. 21, 2016
Applicant:

Vestas Wind Systems A/s, Aarhus N, DK;

Inventors:

Chris Spruce, Leatherhead, GB;

Chakradhar Byreddy, Spring, TX (US);

Assignee:

VESTAS WIND SYSTEMS A/S, Aarhus N, DK;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F03D 7/02 (2006.01); F03D 80/50 (2016.01); F03D 7/04 (2006.01); F03D 9/25 (2016.01); G05B 19/048 (2006.01); G05B 23/02 (2006.01);
U.S. Cl.
CPC ...
F03D 7/0292 (2013.01); F03D 7/046 (2013.01); F03D 7/048 (2013.01); F03D 9/257 (2017.02); F03D 80/50 (2016.05); G05B 19/048 (2013.01); F05B 2220/706 (2013.01); F05B 2260/821 (2013.01); F05B 2270/1033 (2013.01); F05B 2270/20 (2013.01); F05B 2270/332 (2013.01); F05B 2270/335 (2013.01); F05B 2270/404 (2013.01); F05B 2270/808 (2013.01); G05B 23/0283 (2013.01); G05B 2219/2619 (2013.01); Y02E 10/72 (2013.01);
Abstract

Aspects described herein include a method of generating a control schedule for a wind turbine. The control schedule specifies a maximum power level that varies over time. The method comprises determining a value indicative of a current remaining fatigue lifetime of the wind turbine or of one or more components. The method further comprises applying an optimization function to perform an optimization to determine an optimized control schedule. The optimization comprises varying a plurality of parameters of an initial control schedule to produce a varied control schedule, estimating a future fatigue lifetime to be consumed by the wind turbine or the one or more components over the duration of the varied control schedule, and constraining the optimization according to one or more input constraints.


Find Patent Forward Citations

Loading…