The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Dec. 29, 2020

Filed:

Feb. 24, 2016
Applicant:

Siemens Aktiengesellschaft, Munich, DE;

Inventors:

Joachim Nissler, Duisburg, DE;

Hans Schulz, Oberhausen, DE;

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
F04D 27/02 (2006.01); F04D 19/02 (2006.01); F04D 17/12 (2006.01); F04D 19/00 (2006.01); F04D 29/70 (2006.01); F04D 25/16 (2006.01); F04D 29/60 (2006.01); F04D 29/58 (2006.01); F04D 25/06 (2006.01);
U.S. Cl.
CPC ...
F04D 27/0215 (2013.01); F04D 17/12 (2013.01); F04D 19/02 (2013.01); F04D 25/16 (2013.01); F04D 25/163 (2013.01); F04D 27/0253 (2013.01); F04D 27/0292 (2013.01); F04D 29/601 (2013.01); F04D 29/701 (2013.01); F04D 19/00 (2013.01); F04D 25/06 (2013.01); F04D 29/5826 (2013.01); F05D 2230/80 (2013.01);
Abstract

An assembly having a first compressor train and a second compressor train for compressing a process fluid, wherein the first compressor train has a first drive and a first compressor, wherein the second compressor train has a second drive and a second compressor, wherein the first compressor train is not mechanically coupled to rotating parts of the second compressor train for transmission of torque, wherein the two compressors of the different compressor trains are directly connected to each other fluidically by a connecting fluid line such that the first compressor is arranged upstream of the second compressor. The first compressor compresses at a pressure ratio between 1.1 and 1.6 before the process fluid is fed to the second compressor.