The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Dec. 01, 2020

Filed:

Nov. 24, 2016
Applicant:

Hps Home Power Solutions Gmbh, Berlin, DE;

Inventors:

Andreas Hierl, Berlin, DE;

Dirk Radue, Berlin, DE;

Gunnar Schneider, Wildau, DE;

Uwe Benz, Uhldingen, DE;

Kevin Schroder, Berlin, DE;

Zeyad Abul-Ella, Berlin, DE;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H02J 3/14 (2006.01); H02J 3/32 (2006.01); H02J 3/38 (2006.01); F24H 9/20 (2006.01); G05B 13/04 (2006.01); H01M 8/0656 (2016.01); H01M 16/00 (2006.01); H02J 3/00 (2006.01);
U.S. Cl.
CPC ...
H02J 3/14 (2013.01); F24H 9/2021 (2013.01); G05B 13/048 (2013.01); H01M 8/0656 (2013.01); H01M 16/006 (2013.01); H02J 3/32 (2013.01); H02J 3/383 (2013.01); H02J 3/387 (2013.01); H01M 2220/10 (2013.01); H01M 2250/10 (2013.01); H02J 3/003 (2020.01); H02J 2203/20 (2020.01); H02J 2310/14 (2020.01); Y02B 10/14 (2013.01); Y02B 70/3266 (2013.01); Y02E 10/563 (2013.01); Y02E 10/566 (2013.01); Y02E 70/30 (2013.01); Y04S 20/242 (2013.01);
Abstract

A method for operating a domestic energy generation installation comprises ascertaining or prespecifying at least one expectation time period, ascertaining an expected load profile of an electrical consumer, ascertaining an expected yield profile of the regenerative energy source in the expectation time period, ascertaining or prespecifying a minimum consumption power which should be available for withdrawal from the storage battery unit, ascertaining an energy balance over one expectation time period from the expected yield profile and the expected load profile, ascertaining a time range of the storage battery unit from the expected load profile, the expected yield profile and the minimum consumption power, which should not be undershot at any time, and from a currently ascertained state of charge of the storage battery unit, operating the fuel cell unit depending on the ascertained time range and operating the electrolysis unit depending on the ascertained energy balance.


Find Patent Forward Citations

Loading…