The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 24, 2020

Filed:

Apr. 25, 2019
Applicant:

Welltec A/s, Allerød, DK;

Inventor:

Christian Krüger, Allerød, DK;

Assignee:

Welltec A/S, Allerød, DK;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E21B 43/112 (2006.01); E21B 29/00 (2006.01); E21B 29/06 (2006.01); E21B 33/127 (2006.01); E21B 47/09 (2012.01);
U.S. Cl.
CPC ...
E21B 29/005 (2013.01); E21B 29/06 (2013.01); E21B 33/127 (2013.01); E21B 47/09 (2013.01);
Abstract

The present invention relates to a workover tool string for cutting into a production tubing of a well completion having a top, the well completion comprising a casing into which the production tubing is arranged and a production packer arranged between the casing and the production tubing defining an annulus above the production packer, the workover tool string comprising: a longitudinal axis, a first tool string end and a second tool string end, the first tool string end being arranged closer to the top when submerged into the well completion, a tubing cutting unit comprising a body and a cutting edge configured to be rotated around the longitudinal axis while being projected in relation to the body for cutting into a wall of the production tubing from within in order to separate a first part of the production tubing closest to the top from a second part of the production tubing, wherein the workover tool string further comprises a tubing penetration unit comprising a projectable penetration element configured to create at least one hole in the wall of the first part for creating a fluid communication between the annulus and an inside of the production tubing in order to obtain well control by circulating fluid there between, the penetration unit being arranged closer to the first tool string end than the tubing cutting unit. The present invention further relates to a downhole system and to a repairing method.


Find Patent Forward Citations

Loading…