The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Nov. 10, 2020
Filed:
Sep. 19, 2017
China Electric Power Research Institute Company Limited, Beijing, CN;
State Grid Corporation of China, Beijing, CN;
State Grid Sichuan Electric Power Company, Chengdu, CN;
Guodong Huang, Beijing, CN;
Qiang Ding, Beijing, CN;
Zelei Zhu, Beijing, CN;
Sai Dai, Beijing, CN;
Hui Cui, Beijing, CN;
Dan Xu, Beijing, CN;
Zhi Cai, Beijing, CN;
Bo Li, Beijing, CN;
Chenxu Hu, Beijing, CN;
Chuancheng Zhang, Beijing, CN;
Jinghua Yan, Beijing, CN;
Deyue Men, Beijing, CN;
Jiali Zhang, Beijing, CN;
Peijun Li, Beijing, CN;
Zhen Sun, Beijing, CN;
CHINA ELECTRIC POWER RESEARCH INSTITUTE CO. LTD., Beijing, CN;
STATE GRID CORPORATION OF CHINA, Beijing, CN;
STATE GRID SICHUAN ELECTRIC POWER COMPANY, Chengdu, CN;
Abstract
Embodiments provide a method for constructing a future-state power grid model and device, including that: a current power grid model, an equipment power-off plan, an equipment retirement plan and an equipment addition plan are acquired; then, equipment is added according to the current power grid model, and an added equipment information set, a retired equipment information set and a powered-off equipment information set are determined according to the equipment addition plan, the equipment retirement plan and the equipment power-off plan respectively; and finally, a state of the added equipment is set to be an operating state, an initial network model of each period is formed according to a time sequence, and a future-state network model is constructed according to the added equipment information set, the retired equipment information set, the powered-off equipment information set and the initial network models. The embodiments further provide construction equipment and a storage medium.