The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 27, 2020

Filed:

Mar. 22, 2019
Applicant:

General Electric Company, Schenectady, NY (US);

Inventors:

Scott Charles Evans, Burnt Hills, NY (US);

Danian Zheng, Norwalk, CT (US);

Raul Munoz, QRO, MX;

Samuel Bryan Shartzer, Greenville, SC (US);

Brian Allen Rittenhouse, Simpsonville, SC (US);

Samuel Davoust, BY, DE;

Alvaro Enrique Gil, Niskayuna, NY (US);

Nurali Virani, Niskayuna, NY (US);

Ricardo Zetina, QRO, MX;

Assignee:

General Electric Company, Schenectady, NY (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
F03D 17/00 (2016.01); F03D 1/00 (2006.01); F03D 9/25 (2016.01);
U.S. Cl.
CPC ...
F03D 17/00 (2016.05); F03D 1/00 (2013.01); F03D 9/257 (2017.02); F05B 2260/80 (2013.01); F05B 2260/84 (2013.01);
Abstract

A method for assessing or validating wind turbine or wind farm performance produced by one or more upgrades is provided. Measurements of operating data from wind turbines in a wind farm are obtained. Baseline models of performance are generated, and each of the baseline models is developed from a different portion of the operating data. A generating step filters the wind turbines so that they are in a balanced randomized state. An optimal baseline model of performance is selected from the baseline models and the optimal baseline model includes direction. The optimal baseline model of performance and an actual performance of the wind farm or wind turbine is compared. The comparing step determines a difference between an optimal baseline model of power output and an actual power output of the wind farm/turbine. The difference is reflective of a change in the power output produced by the upgrades.


Find Patent Forward Citations

Loading…