The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 20, 2020

Filed:

Dec. 22, 2015
Applicant:

Siemens Energy, Inc., Orlando, FL (US);

Inventors:

Uygar O. Selman, Oviedo, FL (US);

Matthew Kalish, Oviedo, FL (US);

Stephanie Boisvert, Oviedo, FL (US);

Ankur Deshmukh, Oviedo, FL (US);

Marc Fimpel, Erlangen, DE;

Balaji Ramamurthy, Oviedo, FL (US);

Miguel Cancelado, Orlando, FL (US);

Peter Witte, Leiden, NL;

Peter Simon Rop, Benthuizen, NL;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F01K 23/10 (2006.01); F22B 1/18 (2006.01); F02C 6/18 (2006.01); F02G 5/02 (2006.01); F01D 19/00 (2006.01); F01K 9/00 (2006.01); F01K 13/02 (2006.01); F01K 23/04 (2006.01); F01L 19/00 (2006.01);
U.S. Cl.
CPC ...
F01K 23/108 (2013.01); F01K 23/106 (2013.01); F01L 19/00 (2013.01); F02C 6/18 (2013.01); F02G 5/02 (2013.01); F22B 1/1815 (2013.01); F01K 9/00 (2013.01); F01K 13/02 (2013.01); F01K 23/04 (2013.01); Y02E 20/16 (2013.01);
Abstract

A combined cycle power plant and method for operating a combined power plant with stack energy control are presented. The combined cycle power plant includes a gas turbine, a heat recovery steam generator including a plurality of heating surfaces, and a steam turbine. The heating surfaces may be partially bypassed to reduce steam production in the heat recovery steam generator during power plant startup. Less energy may be extracted from exhaust gas of the gas turbine. More energy may be dumped through an exhaust stack. The steam turbine may start without restriction of a gas turbine load during power plant startup. The steam turbine may start without increasing a size of an air cooled condenser while maintaining a higher load of a gas turbine during power plant startup.


Find Patent Forward Citations

Loading…