The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 06, 2020

Filed:

Sep. 26, 2018
Applicant:

Rolls-royce Plc, London, GB;

Inventor:

Matthew Moxon, Derby, GB;

Assignee:

ROLLS-ROYCE plc, London, GB;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F25B 11/04 (2006.01); B64D 27/02 (2006.01); B64D 35/04 (2006.01); H01M 10/613 (2014.01); H01M 10/625 (2014.01); H01M 10/6556 (2014.01); H01M 10/6567 (2014.01); H01M 10/663 (2014.01); B64D 13/06 (2006.01); B64D 27/24 (2006.01); F02C 7/14 (2006.01); H01M 8/04029 (2016.01); H02K 9/19 (2006.01); H02K 11/00 (2016.01);
U.S. Cl.
CPC ...
F25B 11/04 (2013.01); B64D 13/06 (2013.01); B64D 27/02 (2013.01); B64D 27/24 (2013.01); B64D 35/04 (2013.01); F02C 7/14 (2013.01); H01M 8/04029 (2013.01); H01M 10/613 (2015.04); H01M 10/625 (2015.04); H01M 10/6556 (2015.04); H01M 10/6567 (2015.04); H01M 10/663 (2015.04); H02K 9/19 (2013.01); H02K 11/0094 (2013.01); B64D 2013/0603 (2013.01); B64D 2013/0618 (2013.01); B64D 2013/0625 (2013.01); B64D 2027/026 (2013.01); F05D 2220/32 (2013.01); F05D 2220/76 (2013.01); F05D 2260/20 (2013.01); H01M 2220/20 (2013.01); H01M 2250/20 (2013.01);
Abstract

A thermal management system comprises a first heat exchanger configured to exchange heat between a first component and a first working fluid, a first working fluid compressor downstream in first working fluid flow of the first heat exchanger and configured to compress the first working fluid, a second heat exchanger downstream in first working fluid flow of the compressor and configured to exchange heat between the first working fluid and a second working fluid and an expander downstream in first working fluid flow of the second heat exchanger, and configured to expand and cool first working fluid and deliver cooled first working fluid to the first heat exchanger. The system further comprises a third heat exchanger upstream in second working fluid flow of the second heat exchanger, and configured to exchange heat between a second component and the second working fluid.


Find Patent Forward Citations

Loading…