The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 18, 2020

Filed:

Feb. 14, 2018
Applicant:

Johnson Controls Technology Company, Auburn Hills, MI (US);

Inventors:

Andrew J. Przybylski, Franksville, WI (US);

Jon T. Mueller, Milwaukee, WI (US);

Assignee:

Johnson Controls Technology Company, Auburn Hills, MI (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G06F 15/16 (2006.01); F24F 11/52 (2018.01); F24F 11/32 (2018.01); F24F 11/88 (2018.01); H04L 12/28 (2006.01); G06F 8/41 (2018.01); G05B 15/02 (2006.01); G06F 9/50 (2006.01); F24F 11/47 (2018.01); G06F 8/34 (2018.01); G06F 9/455 (2018.01); G06F 8/60 (2018.01); G06F 8/35 (2018.01); G06F 8/20 (2018.01); G06F 3/0481 (2013.01); G06F 3/0484 (2013.01); G06F 9/28 (2006.01); H04L 29/08 (2006.01); G06F 9/451 (2018.01); G05B 19/042 (2006.01); G05B 19/418 (2006.01); G06F 9/448 (2018.01); H04L 12/24 (2006.01);
U.S. Cl.
CPC ...
F24F 11/52 (2018.01); F24F 11/32 (2018.01); F24F 11/47 (2018.01); F24F 11/88 (2018.01); G05B 15/02 (2013.01); G05B 19/0426 (2013.01); G05B 19/41885 (2013.01); G06F 3/0484 (2013.01); G06F 3/04817 (2013.01); G06F 3/04842 (2013.01); G06F 3/04847 (2013.01); G06F 8/20 (2013.01); G06F 8/34 (2013.01); G06F 8/35 (2013.01); G06F 8/45 (2013.01); G06F 8/60 (2013.01); G06F 9/28 (2013.01); G06F 9/4494 (2018.02); G06F 9/451 (2018.02); G06F 9/45512 (2013.01); G06F 9/505 (2013.01); G06F 9/5016 (2013.01); G06F 9/5066 (2013.01); H04L 12/2803 (2013.01); H04L 12/283 (2013.01); H04L 12/2809 (2013.01); H04L 12/2812 (2013.01); H04L 12/2816 (2013.01); H04L 12/2818 (2013.01); H04L 12/2823 (2013.01); H04L 12/2825 (2013.01); H04L 12/2834 (2013.01); H04L 41/22 (2013.01); H04L 67/10 (2013.01); H04L 67/125 (2013.01); H04L 67/327 (2013.01); G05B 2219/2614 (2013.01); G05B 2219/2642 (2013.01); G06F 2209/522 (2013.01); G06F 2212/1044 (2013.01); H04L 67/12 (2013.01); H04L 2012/285 (2013.01); Y02D 10/22 (2018.01); Y02D 10/36 (2018.01);
Abstract

A method for dynamic cloud based control of building equipment via a cloud based building management system includes instantiating a sequencer in response to receiving a startup request, receiving, via the cloud based building management system, a sequence package, wherein the sequence package includes configuration information for interfacing the cloud based building management system with the building site, collecting building data from the building equipment of the building site based on the sequence package, causing a control process to execute based on the collected data, and dispatching a command to the building equipment based on a result of the execution of the control process, wherein the command includes a command to control the building equipment to control an environmental condition of the building site.


Find Patent Forward Citations

Loading…