The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jul. 28, 2020

Filed:

Jun. 26, 2017
Applicant:

Microsoft Technology Licensing, Llc, Redmond, WA (US);

Inventors:

Paresh Maisuria, Issaquah, WA (US);

M. Nashaat Soliman, Redmond, WA (US);

Julian Doroftei Calinov, Sammamish, WA (US);

Sandeep Prabhakar, Bellevue, WA (US);

Jihad Tafas, Redmond, WA (US);

Eric R. Kratzer, Carnation, WA (US);

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G06F 1/3287 (2019.01); G06F 1/26 (2006.01); G06F 1/3234 (2019.01); G06F 9/50 (2006.01); G06F 1/329 (2019.01); G06F 1/3212 (2019.01); H04W 52/02 (2009.01);
U.S. Cl.
CPC ...
G06F 1/3287 (2013.01); G06F 1/266 (2013.01); G06F 1/329 (2013.01); G06F 1/3212 (2013.01); G06F 1/3243 (2013.01); G06F 1/3265 (2013.01); G06F 1/3275 (2013.01); G06F 9/5094 (2013.01); H04W 52/0251 (2013.01); H04W 52/0267 (2013.01); H04W 52/0274 (2013.01);
Abstract

A computing device has an energy storage device system with one or more energy storage devices. A target run-time is obtained, which refers to how long the computing device is to run given the current amount of energy in the energy storage device(s). A predicted power usage over the target run-time is determined, and what, if any, power management actions to take in order to achieve the target run-time are determined. The power management actions are then taken. A target charge-time is also obtained, which refers to how long the computing device is to take to charge the energy storage device(s) to a threshold level (e.g., 100% or fully charged). A predicted power gain over the target charge-time is determined, and what, if any, power management actions to take in order to achieve the target charge-time are determined. The power management actions are then taken.


Find Patent Forward Citations

Loading…