The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jul. 07, 2020

Filed:

Dec. 20, 2018
Applicant:

Realtek Semiconductor Corporation, Hsinchu, TW;

Inventors:

Chuan-Hu Lin, Changhua County, TW;

Chung-Yao Chang, Hsinchu County, TW;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H04L 7/00 (2006.01); H04L 25/02 (2006.01); H04L 5/00 (2006.01); H04W 24/08 (2009.01); H04L 27/26 (2006.01); H04W 84/12 (2009.01);
U.S. Cl.
CPC ...
H04L 7/0016 (2013.01); H04L 5/0007 (2013.01); H04L 25/0202 (2013.01); H04L 25/022 (2013.01); H04L 25/0212 (2013.01); H04L 27/2655 (2013.01); H04W 24/08 (2013.01); H04L 5/0023 (2013.01); H04W 84/12 (2013.01);
Abstract

Disclosed is a symbol timing determining device including: a symbol timing detecting circuit detecting a reception signal to obtain a first symbol timing, and shifting the first symbol timing to obtain a second symbol timing; an estimation signal generating circuit processing the reception signal according to the first and the second symbol timings respectively, so as to obtain a first and a second channel estimation frequency-domain signals; a channel estimation impulse response signal generating circuit generating a first and a second channel estimation impulse response time-domain signals according to the first and the second channel estimation frequency-domain signals respectively; a power measuring circuit measuring the energy of the first and the second channel estimation impulse response time-domain signals according to a predetermined signal region respectively; and a decision circuit selecting one of the first and the second symbol timings according to a relation of the measured energy.


Find Patent Forward Citations

Loading…