The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jul. 07, 2020

Filed:

May. 14, 2018
Applicant:

Morton Buildings, Inc., Morton, IL (US);

Inventors:

John H. Leesman, Gilbert, IL (US);

Graham C. G. Morris, Eureka, IL (US);

Assignee:

Morton Buildings, Inc., Morton, IL (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
B28B 23/04 (2006.01); E04C 5/08 (2006.01); E04B 1/41 (2006.01); E04C 5/12 (2006.01); B29C 70/16 (2006.01); B29C 70/56 (2006.01); E04C 5/07 (2006.01); E04C 3/26 (2006.01); B29C 70/50 (2006.01); D06M 101/40 (2006.01);
U.S. Cl.
CPC ...
B28B 23/043 (2013.01); B29C 70/16 (2013.01); B29C 70/56 (2013.01); E04B 1/41 (2013.01); E04B 1/4171 (2013.01); E04C 5/07 (2013.01); E04C 5/085 (2013.01); E04C 5/127 (2013.01); B29C 70/50 (2013.01); B29C 2791/003 (2013.01); D06M 2101/40 (2013.01); E04C 3/26 (2013.01);
Abstract

A system and method for allowing components to attach to a pre-cast pre-stressed concrete structure is provided. The system includes a first attachment part and a second attachment part. The first attachment part has a first body. The first body has a first concrete structure facing side and a first plurality of attachment members extending from the concrete structure facing side. The second attachment part has a second body. The second body has a second concrete structure facing side and a second plurality of attachment members extending from the concrete structure facing side. The first and second attachment parts are spaced apart forming a compressible junction therebetween. The pre-cast, pre-stressed concrete structure is formed from uncured cement, at least of a portion of the first and second attachment members being embedded in the pre-cast, pre-stressed concrete structure.


Find Patent Forward Citations

Loading…