The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 30, 2020

Filed:

Aug. 03, 2018
Applicant:

General Electric Company, Schenectady, NY (US);

Inventors:

Vaidhya Nath Venkitanarayanan, Schenectady, NY (US);

Pedro Arsuaga Santos, Greenville, SC (US);

Megan Ann DeWitt, Boston, MA (US);

Assignee:

General Electric Company, Schenectady, NY (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F03D 7/04 (2006.01); H02S 10/12 (2014.01); F03D 9/11 (2016.01); F03D 9/25 (2016.01); H02J 9/06 (2006.01); H02J 11/00 (2006.01);
U.S. Cl.
CPC ...
F03D 7/048 (2013.01); F03D 9/11 (2016.05); F03D 9/255 (2017.02); F05B 2260/42 (2013.01); F05B 2270/337 (2013.01); H02J 9/062 (2013.01); H02J 11/00 (2013.01); H02S 10/12 (2014.12);
Abstract

A method for operating at least one energy storage device of a renewable energy facility connected to a power grid in multiple operational modes includes providing an operational threshold for the renewable energy facility. Further, the method includes comparing an operational parameter of the renewable energy facility with respect to the operational threshold. The method also includes controlling the renewable energy facility based on the comparison. As such, when the operational parameter is below the operational threshold, the controller communicates to the energy storage device(s) to increase its state of charge (SOC) in anticipation of the renewable energy facility transitioning from producing power to consuming power. In contrast, when the operational parameter is at or above the operational threshold, the controller communicates to the energy storage device(s) to decrease its state of charge (SOC) in anticipation of a curtailment event of the power grid to prevent the renewable energy facility from releasing and sending power to the power grid.


Find Patent Forward Citations

Loading…