The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
May. 19, 2020

Filed:

Jun. 16, 2015
Applicants:

General Electric Company, Schenectady, NY (US);

Exxonmobil Upstream Research Company, Houston, TX (US);

Inventors:

Brian Allen Rittenhouse, Simpsonville, SC (US);

Karl Dean Minto, Schenectady, NY (US);

Assignees:

General Electric Company, Schenectady, NY (US);

ExxonMobil Upstream Research Company, Spring, TX (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
F02C 7/00 (2006.01); F02C 7/268 (2006.01); F02N 11/08 (2006.01); F02C 6/18 (2006.01); F02C 3/34 (2006.01); F01K 13/02 (2006.01); F01D 19/02 (2006.01);
U.S. Cl.
CPC ...
F02C 7/268 (2013.01); F01D 19/02 (2013.01); F01K 13/02 (2013.01); F02C 3/34 (2013.01); F02C 6/18 (2013.01); F02N 11/08 (2013.01); F05D 2220/722 (2013.01); F05D 2220/76 (2013.01); F05D 2260/85 (2013.01); Y02E 20/16 (2013.01); Y02E 20/18 (2013.01);
Abstract

In one embodiment, a system includes a drive train starter system. The drive train starter system includes a generator mechanically coupled to a drive train of a gas turbine system and an exciter system electrically coupled to the generator and configured to provide a magnetic field. The drive train starter system additionally includes a load commutated inverter (LCI) electrically coupled to the generator and configured to provide electrical power to the generator and a controller communicatively coupled to the generator, the exciter system, and the LCI. The controller is configured to start up the drive train via the LCI and the generator up to less than a drive train operating speed, wherein the generator is converting electricity into mechanical motion; drive the drive train via a gas turbine up to the drive train operating speed; and to drive the drive train via the generator at the drive train operating speed.


Find Patent Forward Citations

Loading…