The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
May. 19, 2020
Filed:
Aug. 03, 2018
China University of Mining and Technology, Xuzhou, Jiangsu, CN;
Xuzhou Jinbo Safety and Technology Co., Ltd, Xuzhou, Jiangsu, CN;
China University of Mining and Technology, Xuzhou, Jiangsu, CN;
XUZHOU JINBO SAFETY AND TECHNOLOGY CO., LTD., Xuzhou, Jiangsu, CN;
Abstract
Disclosed is a method for rock burst prevention by active support reinforcement and active pressure relief. The method comprises the following steps: A. rating a burst tendency based on a comprehensive index method: determining a zone as a general risk region or a mediate risk region by using a comprehensive index method; B. predicting a burst risk region and determining pressure relief borehole parameters in real time by using a drill cuttings method: determining borehole parameters of the general risk region and the mediate risk region; C. drilling holes after determining arrangement patterns of large-diameter pressure relief boreholes according to different burst risk levels; D. forming a 'coal wall-bolt-grouting hole sealing' support reinforcement system through a roadway support system; and E. monitoring a pressure relief effect of the support reinforcement system: until a required effect of preventing bursts by pressure relief is achieved while the support is reinforced. The present invention can not only achieve an effect of preventing rock bursts by pressure relief but also enhance the integrity of a coal wall in a roadway excavation process, thereby achieving the objective of rock burst prevention by active support reinforcement and active pressure relief.