The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 14, 2020

Filed:

Dec. 16, 2016
Applicant:

Industrial Technology Research Institute, Hsinchu, TW;

Inventors:

Chien-An Chen, New Taipei, TW;

Wen-Ching Lee, Yunlin County, TW;

Tzu-Hui Wu, Tainan, TW;

Pei-Shin Jiang, Hsinchu, TW;

Ping-Jung Wu, Changhua County, TW;

Ruey-Shyan Hong, Taoyuan, TW;

Hsiao-Jou Chang, New Taipei, TW;

Chun-Chieh Huang, Hsinchu, TW;

Ting-Hsuan Chen, Taipei, TW;

Chih-Lung Lin, Taichung, TW;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G01N 1/36 (2006.01); G01N 1/40 (2006.01); C12N 15/10 (2006.01); B01L 7/00 (2006.01); B01L 3/00 (2006.01); G01N 33/48 (2006.01); C12M 1/42 (2006.01);
U.S. Cl.
CPC ...
G01N 1/36 (2013.01); B01L 3/508 (2013.01); B01L 7/52 (2013.01); C12N 15/10 (2013.01); B01L 2200/025 (2013.01); B01L 2200/0605 (2013.01); B01L 2200/0621 (2013.01); B01L 2200/0631 (2013.01); B01L 2300/0681 (2013.01); B01L 2300/0832 (2013.01); B01L 2300/0867 (2013.01); B01L 2400/0478 (2013.01); B01L 2400/0622 (2013.01); B01L 2400/0644 (2013.01); C12M 1/42 (2013.01); G01N 33/48 (2013.01);
Abstract

A biological sample processing device includes a base, a purification unit, a metering unit and a first tube. The purification unit is disposed on the base and is configured to purify a sample. The metering unit is disposed on the base and has an inlet, at least one metering trough and an overflow trough. The inlet is connected to the purification unit via the first tube, and the metering trough is connected between the inlet and the overflow trough. The sample from the purification unit is configured to enter the metering unit through the inlet to be moved toward the metering trough, and to be moved toward the overflow trough after the metering trough is filled with the sample.


Find Patent Forward Citations

Loading…