The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 14, 2020

Filed:

Aug. 21, 2015
Applicant:

Chevron U.s.a. Inc., San Ramon, CA (US);

Inventors:

Tiantian Zhang, Houston, TX (US);

Morteza Sayarpour, Houston, TX (US);

Omer Izgec, Houston, TX (US);

Assignee:

CHEVRON U.S.A. INC., San Ramon, CA (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
E21B 41/00 (2006.01); E21B 43/20 (2006.01); E21B 43/14 (2006.01); E21B 43/16 (2006.01); E21B 47/00 (2012.01); G01N 27/22 (2006.01); E21B 49/00 (2006.01); G01V 99/00 (2009.01);
U.S. Cl.
CPC ...
E21B 41/0092 (2013.01); E21B 43/14 (2013.01); E21B 43/16 (2013.01); E21B 43/20 (2013.01); E21B 47/00 (2013.01); E21B 47/0003 (2013.01); E21B 49/00 (2013.01); G01N 27/22 (2013.01); G01V 99/005 (2013.01);
Abstract

Described herein are various embodiments of computer-implemented methods, computing systems, and program products for analyzing a flood operation on a hydrocarbon reservoir. For example, an embodiment of a computer implemented method of analyzing a flood operation on a hydrocarbon reservoir having heavy oil is provided. The embodiment includes, for a first injection well of the hydrocarbon reservoir: receiving injection rate data and production rate data, establishing a plurality of time windows based on breakthrough time of each production well that has broken through until the current date, and running capacitance resistance modeling for each established time window to generate interwell connectivities for each well pair. The embodiment further includes determining a value of injected fluid for the first injection well as a function of time in the future using a continuous function estimated interwell connectivity and an estimated oil-cut value.


Find Patent Forward Citations

Loading…