The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 17, 2020

Filed:

Jul. 28, 2017
Applicant:

Con Edison Battery Storage, Llc, Valhalla, NY (US);

Inventors:

Radu Dorneanu, Greendale, WI (US);

Michael J. Wenzel, Oak Creek, WI (US);

Mohammad N. Elbsat, Milwaukee, WI (US);

Kirk H. Drees, Cedarburg, WI (US);

Assignee:

Con Edison Battery Storage, LLC, Valhalla, NY (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H02J 7/00 (2006.01); H01M 10/48 (2006.01); G05B 15/02 (2006.01); G01R 31/382 (2019.01); G06Q 50/06 (2012.01); H02J 7/34 (2006.01); H02J 3/38 (2006.01); H02J 3/32 (2006.01);
U.S. Cl.
CPC ...
H02J 7/007 (2013.01); G01R 31/382 (2019.01); G05B 15/02 (2013.01); G06Q 50/06 (2013.01); H01M 10/486 (2013.01); H02J 3/32 (2013.01); H02J 3/381 (2013.01); H02J 7/0063 (2013.01); H02J 7/34 (2013.01); H02J 2007/0067 (2013.01);
Abstract

A frequency response optimization system includes a battery configured to store and discharge electric power, a power inverter configured to control an amount of the electric power stored or discharged from the battery, a high level controller, and a low level controller. The high level controller is configured to receive a regulation signal from an incentive provider, determine statistics of the regulation signal, and use the statistics of the regulation signal to generate an optimal frequency response midpoint. The optimal midpoint achieves a desired change in the state-of-charge of the battery while participating in a frequency response program. The low level controller is configured to use the midpoints to determine optimal battery power setpoints for the power inverter. The power inverter is configured to use the optimal battery power setpoints to control an amount of the electric power stored or discharged from the battery.


Find Patent Forward Citations

Loading…