The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 17, 2020

Filed:

Sep. 29, 2017
Applicant:

Kawasaki Jukogyo Kabushiki Kaisha, Kobe-shi, Hyogo, JP;

Inventors:

Akihiro Kondo, Kobe, JP;

Hideyasu Muraoka, Akashi, JP;

Kazuto Fujiyama, Kobe, JP;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F15B 13/044 (2006.01); F15B 11/10 (2006.01); E02F 3/42 (2006.01); E02F 9/20 (2006.01); E02F 9/22 (2006.01); F15B 13/043 (2006.01); F15B 11/044 (2006.01); F15B 11/02 (2006.01);
U.S. Cl.
CPC ...
F15B 11/10 (2013.01); E02F 3/425 (2013.01); E02F 9/2004 (2013.01); E02F 9/22 (2013.01); E02F 9/2203 (2013.01); E02F 9/2225 (2013.01); E02F 9/2285 (2013.01); E02F 9/2292 (2013.01); F15B 11/02 (2013.01); F15B 11/044 (2013.01); F15B 13/043 (2013.01); F15B 13/0442 (2013.01); E02F 9/2296 (2013.01); F15B 2211/20523 (2013.01); F15B 2211/20576 (2013.01); F15B 2211/40592 (2013.01); F15B 2211/428 (2013.01); F15B 2211/633 (2013.01); F15B 2211/6309 (2013.01); F15B 2211/6313 (2013.01); F15B 2211/6346 (2013.01); F15B 2211/6355 (2013.01); F15B 2211/6654 (2013.01); F15B 2211/7053 (2013.01);
Abstract

A hydraulic excavator drive system includes: first and second pumps; arm cylinder; arm first control valve connected to the cylinder by an arm crowding supply line and arm pushing supply line; arm second control valve connected to the supply lines by a first and second replenishment line; and arm operation device that outputs an operation signal corresponding to an inclination angle of an operating lever. The arm second control valve is configured so, when performing an arm crowding operation, an opening area at a meter-in side changes in accordance with the operation signal, and an opening area at a meter-out side is: kept to zero when a predetermined condition is not satisfied; and kept to zero until the operation signal becomes a setting value or greater, and when the operation signal has become the setting value or greater, increases to a maximum value when the predetermined condition is satisfied.


Find Patent Forward Citations

Loading…