The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 25, 2020

Filed:

Dec. 16, 2014
Applicant:

Telefonaktiebolaget Lm Ericsson (Publ), Stockholm, SE;

Inventors:

Filip Mestanov, Sollentuna, SE;

Johan Söder, Stockholm, SE;

Yu Wang, Solna, SE;

Leif Wilhelmsson, Dalby, SE;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H04W 72/00 (2009.01); H04W 72/10 (2009.01); H04W 74/08 (2009.01); H04L 12/24 (2006.01); H04W 28/02 (2009.01); H04W 88/08 (2009.01); H04W 74/00 (2009.01); H04L 12/927 (2013.01); H04W 28/16 (2009.01);
U.S. Cl.
CPC ...
H04W 72/10 (2013.01); H04L 41/0816 (2013.01); H04W 28/0268 (2013.01); H04W 74/0816 (2013.01); H04W 88/08 (2013.01); H04L 41/5003 (2013.01); H04L 47/805 (2013.01); H04W 28/16 (2013.01); H04W 74/002 (2013.01);
Abstract

A first wireless Access Point (AP) nodeand a method therein for controlling radio resource usage. The first wireless AP node is arranged to have a first Radio Frequency (RF) coverage areathat is at least partly overlapping with a second RF coverage areaof a second wireless AP node. The first and second wireless AP nodes are arranged to operate on the same RF channel. The method comprises configuring a first priority level of the first wireless AP node in relation to a second priority level of the second wireless AP node, which first and second priority levels are priority levels for accessing the RF channel. The method further comprises transmitting, to a wireless deviceassociated with the first wireless AP node, data via the RF channel in dependence of the first priority level. Thereby, the radio resource usage is controlled. According to some embodiments, the priority level is set based on negotiations between the first and second wireless AP nodes. According to other embodiments, the priority level is set based on communication between the first wireless AP node and a management node


Find Patent Forward Citations

Loading…