The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 28, 2020

Filed:

Aug. 03, 2018
Applicant:

Eaton Intelligent Power Limited, Dublin, IE;

Inventors:

David Austin Eldridge, Knoxville, TN (US);

Ronald L. Thompson, Knoxville, TN (US);

Brandon J. Rogers, Knoxville, TN (US);

Maximilian A. Mueller, Knoxville, TN (US);

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G01R 31/40 (2014.01); H02H 7/22 (2006.01); G01D 4/00 (2006.01); H02J 13/00 (2006.01); H02S 50/10 (2014.01); H02J 3/14 (2006.01);
U.S. Cl.
CPC ...
G01R 31/40 (2013.01); G01D 4/002 (2013.01); H02H 7/22 (2013.01); H02J 13/00 (2013.01); H02S 50/10 (2014.12); H02J 2003/146 (2013.01); Y02B 70/346 (2013.01); Y02B 90/241 (2013.01); Y04S 20/32 (2013.01); Y04S 20/36 (2013.01); Y04S 20/44 (2013.01); Y04S 20/525 (2013.01);
Abstract

An electric power distribution system is used with an electric power source. The electric power distribution system includes a first device exchanging first electric power with the electric power source. The first device exchanges the first electric power with a plurality of second devices and meters first electric energy corresponding to the first electric power. The second devices exchange the first electric power with the first device. Each of the second devices exchanges second electric power as at least part of the first electric power with a number of corresponding electric loads and meter second electric energy corresponding to the second electric power. A processor includes a routine that compares the metered first electric energy from the first device with a sum of the metered second electric energy from each of the second devices, and responsively determines proper or improper operation of the electric power distribution system.


Find Patent Forward Citations

Loading…