The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Dec. 24, 2019

Filed:

Jan. 04, 2017
Applicant:

Enphase Energy, Inc., Petaluma, CA (US);

Inventors:

Donald Richard Zimmanck, Petaluma, CA (US);

Martin Fornage, Petaluma, CA (US);

Michael J. Harrison, Petaluma, CA (US);

Christopher Rowe, Old Bar, AU;

Assignee:

Enphase Energy, Inc., Petaluma, CA (US);

Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
H02J 1/00 (2006.01); H02J 3/00 (2006.01); H02J 3/38 (2006.01); H02J 3/46 (2006.01); H02J 3/24 (2006.01); H02J 3/32 (2006.01); H02J 13/00 (2006.01);
U.S. Cl.
CPC ...
H02J 3/383 (2013.01); H02J 3/24 (2013.01); H02J 3/32 (2013.01); H02J 3/46 (2013.01); H02J 13/002 (2013.01); H02J 13/0075 (2013.01); Y02E 10/563 (2013.01); Y02E 10/566 (2013.01); Y02E 40/72 (2013.01); Y02E 70/30 (2013.01); Y04S 10/123 (2013.01);
Abstract

A method and apparatus for autonomously operating a microgrid power generator. In one embodiment, the method comprises obtaining a first measurement of at least one grid parameter of a microgrid transmission line coupled to a power generator in a microgrid; comparing the first measurement to a turn-on threshold; initiating, when the first measurement is less than the turn-on threshold, power generation by the power generator; obtaining, after initiation of the energy generation, a second measurement of the at least one grid parameter of the microgrid transmission line; comparing the second measurement to a shut-down threshold that is greater than the turn-on threshold; and stopping, when the second measurement exceeds the shut-down threshold, the power generation by the power generator.


Find Patent Forward Citations

Loading…