The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 05, 2019

Filed:

Sep. 08, 2016
Applicant:

Honda Motor Co., Ltd., Tokyo, JP;

Inventor:

Kiyoshi Handa, Wako, JP;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F17C 5/00 (2006.01); F17C 1/00 (2006.01); F17C 5/06 (2006.01); F17C 13/08 (2006.01);
U.S. Cl.
CPC ...
F17C 5/007 (2013.01); F17C 1/005 (2013.01); F17C 5/06 (2013.01); F17C 13/084 (2013.01); F17C 2201/056 (2013.01); F17C 2205/0329 (2013.01); F17C 2205/0335 (2013.01); F17C 2205/0394 (2013.01); F17C 2221/012 (2013.01); F17C 2223/0123 (2013.01); F17C 2223/035 (2013.01); F17C 2225/0123 (2013.01); F17C 2225/035 (2013.01); F17C 2227/047 (2013.01); F17C 2250/032 (2013.01); F17C 2250/043 (2013.01); F17C 2250/0434 (2013.01); F17C 2250/0439 (2013.01); F17C 2250/0443 (2013.01); F17C 2250/075 (2013.01); F17C 2260/023 (2013.01); F17C 2260/025 (2013.01); F17C 2265/065 (2013.01); F17C 2270/0184 (2013.01); F17C 2270/0763 (2013.01); Y02E 60/321 (2013.01);
Abstract

A hydrogen gas filling method includes: a step for acquiring a pre-supply upstream pressure that is a pressure in a station side of a piping at time t, a step for starting the supply of hydrogen gas from the station at time tthat is after the pre-supply upstream pressure is acquired, a step for acquiring a post-supply upstream pressure at time tthat is immediate after the supply of hydrogen gas starts, a step for acquiring a start-time flowrate that is a flowrate of hydrogen gas at the same period as the step for starting, a step for estimating the pressure loss generated in the piping at the time of the supply by using the pre-supply upstream pressure, post-supply upstream pressure, and the start-time flowrate, and a step for stopping the supply of hydrogen gas so that a tank pressure conforms with a predetermined target pressure.


Find Patent Forward Citations

Loading…