The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 08, 2019

Filed:

Nov. 14, 2014
Applicant:

Nautilus Data Technologies, Inc., San Ramon, CA (US);

Inventors:

Arnold C. Magcale, San Ramon, CA (US);

Daniel Kekai, San Ramon, CA (US);

Assignee:

Nautilus Data Technologies, Inc., Pleasanton, CA (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G05D 17/00 (2006.01); G06F 9/48 (2006.01); A63C 17/14 (2006.01); G06F 9/50 (2006.01); A63C 17/26 (2006.01); G05B 15/02 (2006.01); G05F 1/66 (2006.01); A63C 17/01 (2006.01); F16B 2/06 (2006.01); F16B 9/02 (2006.01); F16M 11/04 (2006.01); F16M 13/02 (2006.01);
U.S. Cl.
CPC ...
G06F 9/4856 (2013.01); A63C 17/1418 (2013.01); A63C 17/26 (2013.01); G05B 15/02 (2013.01); G05F 1/66 (2013.01); G06F 9/505 (2013.01); A63C 17/01 (2013.01); A63C 2017/1463 (2013.01); A63C 2203/14 (2013.01); F16B 2/065 (2013.01); F16B 9/023 (2013.01); F16M 11/04 (2013.01); F16M 13/02 (2013.01); Y02D 10/32 (2018.01); Y10T 24/44017 (2015.01);
Abstract

Systems and methods for intelligent data center power management and energy market disaster recovery comprised of data collection layer, analytics/automation/actions layer, energy markets analysis layer. Plurality of data centers employ the systems and methods comprised of a plurality of Tierdata centers that may be running applications, virtual machines and physical computer systems to enable data center and application disaster recovery from utility energy market outages. Systems and methods may be employed to enable application load balancing and data center power load balancing across a plurality of data centers may lead to financial benefits when moving application and power loads from one data center location using power during peak energy hours to another data center location using power during off-peak hours.