The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 27, 2019

Filed:

Sep. 23, 2016
Applicant:

Dril-quip Inc., Houston, TX (US);

Inventors:

Bruce Joseph Witwer, Cypress, TX (US);

Justin Edward Morse, Houston, TX (US);

Daniel J. McLaughlin, Katy, TX (US);

Gregory Dale Williams, Houston, TX (US);

James R. Bower, Deer Park, TX (US);

Assignee:

Dril-Quip, Inc., Houston, TX (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
E21B 43/013 (2006.01); E21B 17/01 (2006.01); E21B 33/035 (2006.01); E21B 33/043 (2006.01); E21B 33/064 (2006.01); E21B 34/04 (2006.01); E21B 34/16 (2006.01); E21B 41/00 (2006.01);
U.S. Cl.
CPC ...
E21B 43/013 (2013.01); E21B 17/01 (2013.01); E21B 33/0355 (2013.01); E21B 33/043 (2013.01); E21B 33/064 (2013.01); E21B 34/04 (2013.01); E21B 34/16 (2013.01); E21B 41/0007 (2013.01);
Abstract

In accordance with the present disclosure, a full top-to-bottom subsea system and method used to drill, complete, produce, and perform interventions on HPHT subsea wells is provided. The disclosed systems and methods involve the use of a controlled multiple barrier system, such as a high integrity pipeline protection system (HIPPS), incorporated into the subsea system to divide the system into two sections. The sections on either side of the barrier may be rated for different pressures, temperatures, and/or flow rates. For example, the first section (upstream of the barrier) is rated for operating at pressures/temperatures/flow rates up to a first (higher) threshold. The second section (downstream of the barrier) is rated for operating at pressures/temperatures/flow rates up to a second (lower) threshold. The disclosed subsea production system methodology, which uses barriers to divide the system components between two pressure ratings, may allow for enhanced development of HPHT reservoirs.


Find Patent Forward Citations

Loading…