The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jul. 30, 2019

Filed:

Dec. 20, 2016
Applicant:

Toyota Jidosha Kabushiki Kaisha, Toyota-shi, Aichi-ken, JP;

Inventors:

Toshifumi Yamakawa, Okazaki, JP;

Masaki Okamura, Toyota, JP;

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
B60L 1/00 (2006.01); B60L 3/00 (2019.01); H02G 3/00 (2006.01); B60L 15/00 (2006.01); H02M 7/44 (2006.01); B60L 15/20 (2006.01); B60L 50/51 (2019.01);
U.S. Cl.
CPC ...
B60L 15/007 (2013.01); B60L 3/003 (2013.01); B60L 3/0007 (2013.01); B60L 15/20 (2013.01); B60L 50/51 (2019.02); H02M 7/44 (2013.01); B60L 2210/10 (2013.01); B60L 2210/42 (2013.01); B60L 2240/465 (2013.01); B60L 2240/529 (2013.01); B60L 2240/80 (2013.01); B60Y 2200/92 (2013.01); B60Y 2400/112 (2013.01); B60Y 2400/114 (2013.01); Y02T 10/645 (2013.01); Y02T 10/7005 (2013.01); Y02T 10/7216 (2013.01); Y02T 10/7275 (2013.01);
Abstract

A power system has a first converter; a second converter; a first controller for generating a first command and a second command, controlling the first converter on the basis of the first command, and transmitting the second command to a second controller; and the second controller for controlling the second converter on the basis of the second command. The first controller adjusts the first command to cancel at least one of shortage and excess of second current by first current. The second controller controls the second converter on the basis of the second command when the first command is smaller than first upper limit. The second controller controls the second converter on the basis of second upper limit when the first command reaches the first upper limit.


Find Patent Forward Citations

Loading…