The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jul. 02, 2019

Filed:

Feb. 06, 2015
Applicant:

University of Maine System Board of Trustees, Orono, ME (US);

Inventors:

Habib J. Dagher, Veazie, ME (US);

Anthony M. Viselli, Bangor, ME (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
B63B 9/06 (2006.01); B63B 5/18 (2006.01); F03D 13/25 (2016.01); F03D 1/06 (2006.01); F03D 3/00 (2006.01); B63B 1/10 (2006.01); F03D 13/10 (2016.01); B63B 21/20 (2006.01); B63B 21/50 (2006.01); B21D 47/00 (2006.01); B63B 35/44 (2006.01);
U.S. Cl.
CPC ...
B63B 9/065 (2013.01); B63B 1/107 (2013.01); B63B 5/18 (2013.01); B63B 21/20 (2013.01); B63B 21/502 (2013.01); F03D 1/06 (2013.01); F03D 3/005 (2013.01); F03D 13/10 (2016.05); F03D 13/25 (2016.05); B21D 47/00 (2013.01); B63B 2009/067 (2013.01); B63B 2021/505 (2013.01); B63B 2035/446 (2013.01); F05B 2230/60 (2013.01); F05B 2240/93 (2013.01); Y02B 10/30 (2013.01); Y02E 10/721 (2013.01); Y02E 10/727 (2013.01); Y02P 70/523 (2015.11); Y10T 29/49616 (2015.01);
Abstract

A method of assembling a floating wind turbine platform includes assembling a keystone having a hollow central cavity from pre-formed concrete sections, and assembling a plurality of buoyant bottom beams from pre-formed concrete sections. Each bottom beam is attached to, and extends radially outward of the keystone to define a base assembly. Each buoyant bottom beam includes a ballast chamber therein. The keystone is post-tensioned to each bottom beam along a longitudinal axis thereof. A center column is assembled upwardly and perpendicularly on the base assembly from pre-formed sections of the center column, the outer columns are assembled on a distal end of each bottom beam from pre-formed sections of the outer columns, and the center column and the outer columns are longitudinally post-tensioned to the base assembly. A tower is assembled on the center column from pre-formed sections, and a wind turbine is assembled on the tower.