The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 25, 2019

Filed:

Jun. 05, 2015
Applicant:

Amazon Technologies, Inc., Seattle, WA (US);

Inventors:

Antonio William Vasquez Ramirez, Snohomish, VA (US);

Matthew Thomas Phillips, Bainbridge Island, WA (US);

Faran Harold Kaplan, Seattle, WA (US);

Assignee:

Amazon Technologies, Inc., Seattle, WA (US);

Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
H05K 7/20 (2006.01); H05K 7/18 (2006.01); G06F 1/26 (2006.01); G01R 31/02 (2006.01);
U.S. Cl.
CPC ...
H05K 7/20709 (2013.01); G06F 1/26 (2013.01); H05K 7/18 (2013.01); H05K 7/20718 (2013.01); H05K 7/20745 (2013.01); H05K 7/20754 (2013.01); H05K 7/20836 (2013.01); H05K 7/20945 (2013.01); G01R 31/021 (2013.01); Y10T 29/4902 (2015.01); Y10T 29/49004 (2015.01);
Abstract

Data center mechanical infrastructure is incrementally deployed and commissioned to support incremental changes in computing capacity in a data center while mitigating interaction between infrastructure being commissioned and installed computer systems. Incremental mechanical infrastructure commissioning can be concurrent with incremental electrical infrastructure commissioning and includes operating mechanical infrastructure to remove heat generated as a result of operating electrical infrastructure to support simulated electrical loads as part of electrical infrastructure commissioning. Incremental mechanical infrastructure deployment can be based on the power support capacity provided by incrementally deployed electrical infrastructure. Incremental infrastructure deployment can include partitioning a space in which incremental mechanical infrastructure is configured to provide cooling, so that heat generation and removal in the space, based on commissioning the incremental mechanical infrastructure, is isolated electrical and cooling support provided to electrical loads located in a remainder of the data center.