The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 04, 2019

Filed:

Feb. 09, 2015
Applicant:

Mitsubishi Electric Corporation, Tokyo, JP;

Inventors:

Kaori Sato, Tokyo, JP;

Ichiro Maruyama, Tokyo, JP;

Satoshi Minezawa, Tokyo, JP;

Hirotoshi Yano, Tokyo, JP;

Masaaki Yabe, Tokyo, JP;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H02J 3/00 (2006.01); H02J 3/14 (2006.01); H02J 3/32 (2006.01); H02J 7/00 (2006.01); G05B 13/02 (2006.01); G07F 15/00 (2006.01); H02J 13/00 (2006.01); G01R 19/165 (2006.01);
U.S. Cl.
CPC ...
G07F 15/006 (2013.01); G01R 19/16547 (2013.01); G05B 13/026 (2013.01); H02J 3/008 (2013.01); H02J 3/14 (2013.01); H02J 3/32 (2013.01); H02J 7/0068 (2013.01); H02J 13/0096 (2013.01); Y02B 70/3225 (2013.01); Y02B 70/3266 (2013.01); Y04S 20/222 (2013.01); Y04S 20/224 (2013.01); Y04S 20/242 (2013.01); Y04S 50/10 (2013.01);
Abstract

A prediction value calculator calculates a prediction value of an electricity fee based on the amount of electric power supplied from a commercial electric power source to electric equipment within an electricity fee calculation period. A selector selects, as a first-stage control, either one control of an electric power saving control for the electric equipment and a charge-discharge control in which the electric power supplied from the commercial electric power source is stored in a storage battery in a first time slot and the electric power stored in the storage battery is supplied to the electric equipment in a second time slot in which the unit cost of the electric power supplied from the commercial electric power source is greater than that in the first time slot. A controller executes the first-stage control selected by the selector when the prediction value calculated by the prediction value calculator is greater than a targeted value of the electricity fee.


Find Patent Forward Citations

Loading…