The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Apr. 09, 2019
Filed:
Jan. 12, 2018
Cccc Highway Consultants Co., Ltd., Beijing, CN;
CCCC Highway Consultants Co., Ltd., Beijing, CN;
Abstract
The present application discloses an integrated immersed tube section and an installation method thereof, and an installation and closure method of immersed tube sections, wherein the integrated immersed tube section includes a standard immersed tube section; and closed annular telescopic water stop joints are arranged at two ends of the standard immersed tube section. By the adoption of the integrated immersed tube section of the present application, a finally closed immersed tube section is still the standard immersed tube section, and a foundation which is the same as that for common tube sections is used, namely the foundation for the finally closed immersed tube section and the foundation for other immersed tube sections do not have a rigidity difference, so that the risk of the non-uniform settlement of the tube sections during operation of the subsea tunnel is effectively reduced; and in addition, the finally closed immersed tube section and other immersed tube sections are installed with the same installation equipment, and no extra equipment such as a floating crane is needed. Compared with an existing method, the methods have the advantages of eliminating installation of one special final joint, simplifying the construction process and reducing the engineering risk. As offshore special construction equipment and ships are very expensive in rent, use of the integrated immersed tube section substantially reduces the cost and saves various resources.