The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 02, 2019

Filed:

Jun. 01, 2017
Applicant:

Tyco Electronics (Shanghai) Co. Ltd., Shanghai, CN;

Inventors:

Liangliang Xu, Shanghai, CN;

Junfeng Wang, Shanghai, CN;

Xingze Wang, Shanghai, CN;

Lizhang Yang, Shanghai, CN;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G02B 6/00 (2006.01); G02B 6/44 (2006.01); B65H 75/16 (2006.01); B65H 75/28 (2006.01); G02B 6/52 (2006.01); H02G 1/08 (2006.01); B65H 75/40 (2006.01); B65H 75/44 (2006.01); H01B 11/22 (2006.01); H01B 13/00 (2006.01);
U.S. Cl.
CPC ...
G02B 6/4459 (2013.01); B65H 75/16 (2013.01); B65H 75/28 (2013.01); B65H 75/40 (2013.01); B65H 75/4465 (2013.01); B65H 75/4471 (2013.01); G02B 6/4416 (2013.01); G02B 6/4464 (2013.01); G02B 6/4485 (2013.01); G02B 6/52 (2013.01); H01B 11/22 (2013.01); H01B 13/0003 (2013.01); H02G 1/086 (2013.01); B65H 2701/32 (2013.01);
Abstract

A method of laying an optical fiber comprises providing a continuous optical fiber, a first segment of optical-electrical hybrid cable having a first fiber receiving tube, and a second segment of optical-electrical hybrid cable having a second fiber receiving tube. The optical fiber is laid into the first fiber receiving tube using an air-blowing device. A leading end of the optical fiber is fixed in a transfer apparatus after the leading end passes through an outlet of the first fiber receiving tube. A portion of the optical fiber which has passed through the first segment is wound in the transfer apparatus until the optical fiber is completely laid in the first segment. The leading end of the optical fiber is detached from the transfer apparatus. The portion of the optical fiber which has passed through the first segment is laid into the second fiber receiving tube using the air-blowing device.


Find Patent Forward Citations

Loading…