The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 12, 2019

Filed:

Jul. 12, 2016
Applicant:

Nuvera Fuel Cells, Llc, Billerica, MA (US);

Inventors:

Zhijiang Li, Franklin, MA (US);

Kyle Vanzandt, Allston, MA (US);

Assignee:

Nuvera Fuel Cells, LLC, Billerica, MA (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
B01D 53/047 (2006.01); B01D 53/04 (2006.01); B01D 53/06 (2006.01);
U.S. Cl.
CPC ...
B01D 53/047 (2013.01); B01D 53/0407 (2013.01); B01D 53/0423 (2013.01); B01D 53/0446 (2013.01); B01D 53/06 (2013.01); B01D 2253/102 (2013.01); B01D 2253/104 (2013.01); B01D 2253/106 (2013.01); B01D 2253/108 (2013.01); B01D 2256/16 (2013.01); B01D 2257/502 (2013.01); B01D 2257/504 (2013.01); B01D 2257/80 (2013.01); B01D 2259/402 (2013.01); B01D 2259/403 (2013.01); B01D 2259/404 (2013.01); B01D 2259/40005 (2013.01); B01D 2259/406 (2013.01); B01D 2259/40035 (2013.01); B01D 2259/40043 (2013.01); B01D 2259/40083 (2013.01); Y02C 10/08 (2013.01);
Abstract

A pressure swing adsorption (PSA) system for purifying a feed gas is provided. The PSA system may have a first adsorber bed and a second adsorber bed, each having a feed port, a product port, and adsorbent material designed to adsorb one or more impurities from the feed gas to produce a product gas. The PSA system may also have a first valve configured to direct flows of the feed gas and the product gas through a network of piping. The PSA system may further have a first orifice configured to regulate a flow rate of gas between the first adsorber bed and the second adsorber bed during the pressure equalization step and a second orifice configured to regulate a flow rate of gas between the first adsorber bed and the second adsorber bed during the purge step.


Find Patent Forward Citations

Loading…