The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Dec. 25, 2018

Filed:

Dec. 12, 2016
Applicant:

Abb Schweiz Ag, Baden, CH;

Inventors:

Adrian Timbus, Dättwil, CH;

Carsten Franke, Stetten, CH;

Marija Zima, Zürich, CH;

Assignee:

ABB Schweiz AG, Baden, CH;

Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
F03D 7/04 (2006.01); F03D 7/02 (2006.01); F03D 80/50 (2016.01); G05B 13/02 (2006.01); G05B 19/048 (2006.01); G05B 23/02 (2006.01); G05F 1/66 (2006.01); F03D 9/25 (2016.01);
U.S. Cl.
CPC ...
F03D 7/048 (2013.01); F03D 7/0292 (2013.01); F03D 7/043 (2013.01); F03D 7/045 (2013.01); F03D 9/257 (2017.02); F03D 80/50 (2016.05); G05B 13/026 (2013.01); G05B 19/048 (2013.01); G05B 23/0283 (2013.01); G05F 1/66 (2013.01); F05B 2270/20 (2013.01); F05B 2270/332 (2013.01); F05B 2270/404 (2013.01); G05B 2219/24001 (2013.01); G05B 2219/2619 (2013.01); Y02E 10/723 (2013.01);
Abstract

The present application is concerned with a flexible way of operating a wind farm with a plurality of degrading wind turbine components. According to the invention, maintenance scheduling and power production in the wind farm are handled concurrently in a single optimization step. Instead of a serial approach first scheduling maintenance activities and subsequently adapting the power production and/or wind turbine operation the two aspects are optimized together. The wind farm operation takes maintenance aspects into account by adapting life index or health status based on modeled mechanical and electrical stress. Accordingly, the wind farm owner may decide when and how much energy to produce accepting which level of stress to the turbine equipment. The proposed optimization of wind farm operation includes all aspects of transmission network operator settings, the topology of wind farms and the underlying collector grid, the short and long term wind conditions forecasts, the conditions of the turbines, the estimated remaining operational time under different usage patterns and times, as well as aspects of the electricity market.


Find Patent Forward Citations

Loading…