The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Patent No.:

US 10145225 B1

PDF
Full Text
Expired
Date of Patent:
Dec. 04, 2018

Filed:

Jul. 08, 2016
Applicant:

Nexen Energy Ulc, Calgary, CA;

Inventors:

Julio Sanchez, Calgary, CA;

Jason Russell Bruce Dickson, Calgary, CA;

Sergio Merchan, Calgary, CA;

Assignee:

NEXEN ENERGY ULC, Alberta, CA;

Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
E21B 43/24 (2006.01); E21B 43/30 (2006.01); E21B 43/20 (2006.01); E21B 47/06 (2012.01);
U.S. Cl.
CPC ...
E21B 43/2406 (2013.01); E21B 43/20 (2013.01); E21B 43/2408 (2013.01); E21B 43/305 (2013.01); E21B 47/065 (2013.01);
Abstract

A hydrocarbon production process comprising operating a first early stage hydrocarbon production process within a first communication domain with a first well pair, and operating a second early stage hydrocarbon production process within a second communication domain with a second well pair, such that an intermediate reservoir region including stranded bitumen becomes disposed between the first and second communication domains; wherein the first early stage hydrocarbon production process includes injecting a first production-initiating fluid via a first injection well of the first well pair into a first communication domain such that hydrocarbon material is mobilized and conducted to a first production well of the first well pair, and producing the received hydrocarbon material via the first production well; and wherein the second early stage hydrocarbon production process includes injecting a second production-initiating fluid via a second injection well of the second well pair into a second communication domain such that hydrocarbon material is mobilized and conducted to a second production well of the second well pair, and producing the received hydrocarbon material via the second production well; selecting a pre-selected zone within the reservoir, wherein the selecting is based upon temperature fall-off data within the first and second communication zones; and positioning a portion of an infill well within the pre-selected zone for receiving mobilized hydrocarbon material of at least the intermediate reservoir region and for producing the received hydrocarbon material.


Find Patent Forward Citations

Sanchez, Julio. (2018). Later stage hydrocarbon production processes (U.S. Patent No. 10145225). U.S. Patent and Trademark Office. https://idiyas.com/patent/badge/10145225

Data source: USPTO (United States Patent and Trademark Office) public patent records. Weekly synchronization. How IDiyas builds this profile

Loading…