The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 13, 2018

Filed:

Jun. 01, 2016
Applicant:

Toyota Jidosha Kabushiki Kaisha, Toyota-shi, Aichi-ken, JP;

Inventors:

Noriyasu Kobashi, Machida, JP;

Takashi Tsunooka, Gotemba, JP;

Takayuki Otsuka, Susono, JP;

Hiromasa Hashimoto, Susono, JP;

Assignee:

Toyota Jidosha Kabushiki Kaisha, Toyota-shi, Aichi-ken, JP;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
F02D 41/02 (2006.01); F01N 3/02 (2006.01); F01N 3/023 (2006.01); F02D 41/30 (2006.01); F01N 9/00 (2006.01); F02D 41/26 (2006.01);
U.S. Cl.
CPC ...
F02D 41/029 (2013.01); F01N 3/023 (2013.01); F01N 9/002 (2013.01); F02D 41/3005 (2013.01); F01N 2560/08 (2013.01); F01N 2900/1406 (2013.01); F01N 2900/1606 (2013.01); F01N 2900/1611 (2013.01); F02D 41/26 (2013.01);
Abstract

In the present invention, a first regeneration process is executed as a process for oxidizing and removing PM accumulated on the particulate filter if a measured value of a differential pressure sensor is not more than a predetermined upper limit value, assuming that the measured value of the differential pressure sensor is a value to be provided in a state in which only PM is accumulated on the particulate filter, when a difference between an estimated PM accumulation amount estimated from an operation history of an internal combustion engine and a PM accumulation amount calculated from the measured value of the differential pressure sensor is not less than a predetermined threshold value, while a second regeneration process is executed without executing the first regeneration process if the measured value is larger than the predetermined upper limit value.


Find Patent Forward Citations

Loading…