The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Oct. 23, 2018
Filed:
Sep. 06, 2017
Daifuku Co., Ltd., Osaka-shi, JP;
Takuya Gondoh, Tokyo, JP;
Shigeru Sugano, Hinocho, JP;
Atsushi Kurayama, Tokyo, JP;
Masami Iwai, Tokyo, JP;
Atsushi Minoo, Tokyo, JP;
Daifuku Co., Ltd., Osaka-shi, JP;
Abstract
A control unit performs a first loading control and a second loading control. The first loading control is performed to control a loading operation unit to load a plurality of target articles onto a first supporting member according to arrangement information. The second loading control is performed to execute a second determination process based on at least one of: the arrangement information; detection information obtained by the detection unit; and information regarding a loading area, to determine whether or not the remaining articles are loadable onto the first supporting member, and to control the loading operation unit to load the remaining articles onto the first supporting member if the remaining articles are determined as being loadable in the second determination process. While performing the first loading control, if the control unit does not determine in the first determination process that the target articles are in a different state, the control unit continues performing the first loading control, and while performing the first loading control, if the control unit determines in the first determination process that the target articles are in the different state, the control unit performs the second loading control instead of the first loading control.