The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 09, 2018

Filed:

Jan. 26, 2016
Applicant:

General Electric Company, Schenectady, NY (US);

Inventors:

Maruthi Narasinga Rao Devarakonda, Waukesha, WI (US);

Rachel Tarvin Farr, League City, TX (US);

Assignee:

GENERAL ELECTRIC COMPANY, Schenectady, NY (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F01N 3/00 (2006.01); F02B 73/00 (2006.01); F01N 3/20 (2006.01); F02D 41/14 (2006.01); B01D 53/94 (2006.01); F02D 41/02 (2006.01); F02C 9/00 (2006.01); F01N 9/00 (2006.01); F01K 13/02 (2006.01); F01K 23/00 (2006.01);
U.S. Cl.
CPC ...
F02B 73/00 (2013.01); B01D 53/94 (2013.01); B01D 53/9431 (2013.01); B01D 53/9495 (2013.01); F01K 13/02 (2013.01); F01K 23/00 (2013.01); F01N 3/20 (2013.01); F01N 3/208 (2013.01); F01N 9/00 (2013.01); F02C 9/00 (2013.01); F02D 41/0235 (2013.01); F02D 41/14 (2013.01); F01N 2610/02 (2013.01); F05D 2220/32 (2013.01); F05D 2270/05 (2013.01); F05D 2270/07 (2013.01); F05D 2270/08 (2013.01); F05D 2270/13 (2013.01);
Abstract

A system includes a hybrid power plant controller programmed to receive a plurality of signals representative of one or more operating parameters of a hybrid power plant. The hybrid power plant includes at least one gas turbine engine, at least one gas engine, and at least one catalyst system. The hybrid power plant controller is programmed to utilize closed-loop optimal control to generate one or more operational setpoints based on the one or more operating parameters for the hybrid power plant to optimize performance of the hybrid power plant. The hybrid power plant controller uses closed-loop optimal control to provide the one or more operational setpoints to respective controllers of the at least one gas turbine engine, the at least one gas engine, and the at least one catalyst system to control operation of the gas turbine engine, the gas engine, and the catalyst system.


Find Patent Forward Citations

Loading…