The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 14, 2018

Filed:

Feb. 25, 2016
Applicant:

Hitachi Construction Machinery Co., Ltd., Tokyo, JP;

Inventors:

Seiji Ishida, Hitachinaka, JP;

Shinya Imura, Toride, JP;

Masafumi Hita, Tsuchiura, JP;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
B60L 1/00 (2006.01); E02F 9/20 (2006.01); B60L 11/02 (2006.01); B60L 11/12 (2006.01); B60L 11/18 (2006.01); B60K 35/00 (2006.01); G05B 15/02 (2006.01); H02J 7/00 (2006.01); B60K 6/485 (2007.10); E02F 3/32 (2006.01);
U.S. Cl.
CPC ...
E02F 9/2091 (2013.01); B60K 35/00 (2013.01); B60L 1/003 (2013.01); B60L 11/02 (2013.01); B60L 11/123 (2013.01); B60L 11/1857 (2013.01); B60L 11/1861 (2013.01); B60L 11/1872 (2013.01); E02F 9/2075 (2013.01); G05B 15/02 (2013.01); H02J 7/007 (2013.01); H02J 7/0047 (2013.01); B60K 6/485 (2013.01); B60K 2350/352 (2013.01); B60L 2200/40 (2013.01); B60L 2240/545 (2013.01); B60L 2240/549 (2013.01); B60Y 2200/412 (2013.01); B60Y 2300/91 (2013.01); E02F 3/32 (2013.01); H02J 2007/005 (2013.01); Y02T 10/6217 (2013.01); Y02T 10/7005 (2013.01); Y02T 10/705 (2013.01); Y02T 10/7044 (2013.01); Y02T 10/7077 (2013.01); Y10S 903/903 (2013.01);
Abstract

A control device of construction machine that performs tasks by driving a hydraulic pump by means of an electric motor that is driven by electric power of a battery device that is capable to charge and discharge and an engine that is mechanically coupled to the electric motor, includes: a charging/discharging control unit that controls the charging/discharging of the battery device in such a manner that, in case that a heavy load task where an output of the hydraulic pump is large and a light load task where the output of the hydraulic pump is small are alternately performed, when the output of the hydraulic pump during the heavy load task is increased or a time proportion of the heavy load task in the unit period is increased, an average value of charging current of the battery device per the unit period increases, and when the output of the hydraulic pump during the heavy load task is further increased or the time proportion of the heavy load task in the unit period is further increased, then the average value of the charging current of the battery device per the unit period decreases.


Find Patent Forward Citations

Loading…