Growing community of inventors

Melbourne, FL, United States of America

John R Doner

Average Co-Inventor Count = 1.20

ph-index = 10

The patent ph-index is calculated by counting the number of publications for which an author has been cited by other authors at least that same number of times.

Forward Citations = 374

John R DonerDavid L Diana (2 patents)John R DonerMichael Paul Zeitfuss (1 patent)John R DonerKenneth G Bath (1 patent)John R DonerMichael Edwards (1 patent)John R DonerStacey Travis Simmons (1 patent)John R DonerMalcom E Gosdin (1 patent)John R DonerYoussef Sleiman (1 patent)John R DonerKevin N Clyne (1 patent)John R DonerJohn R Doner (12 patents)David L DianaDavid L Diana (2 patents)Michael Paul ZeitfussMichael Paul Zeitfuss (7 patents)Kenneth G BathKenneth G Bath (1 patent)Michael EdwardsMichael Edwards (1 patent)Stacey Travis SimmonsStacey Travis Simmons (1 patent)Malcom E GosdinMalcom E Gosdin (1 patent)Youssef SleimanYoussef Sleiman (1 patent)Kevin N ClyneKevin N Clyne (1 patent)
..
Inventor’s number of patents
..
Strength of working relationships

Company Filing History:

1. Ge Harris Railway Electronics, Inc. (9 from 32 patents)

2. General Electric Company (2 from 51,943 patents)

3. Harris Corporation (1 from 3,523 patents)


12 patents:

1. 7006957 - Locomotive parking management tool

2. 6995686 - Weather information dissemination system for mobile vehicles

3. 6961682 - Yard performance model based on task flow modeling

4. 6873962 - Train corridor scheduling process

5. 6832204 - Train building planning method

6. 6546371 - Train corridor scheduling process including various cost functions associated with railway operations

7. 6490523 - Methods and apparatus for locomotive tracking

8. 6456937 - Methods and apparatus for locomotive tracking

9. 6421587 - Methods and apparatus for locomotive consist determination

10. 6405127 - Method for determining stationary locomotive location in a railyard

11. 6377877 - Method of determining railyard status using locomotive location

12. 6304801 - Train corridor scheduling process including a balanced feasible schedule cost function

Please report any incorrect information to support@idiyas.com
idiyas.com
as of
1/16/2026
Loading…