Growing community of inventors

Dalian, China

Jianjian Shen

Average Co-Inventor Count = 4.39

ph-index = 1

The patent ph-index is calculated by counting the number of publications for which an author has been cited by other authors at least that same number of times.

Forward Citations = 0

Jianjian ShenChuntian Cheng (6 patents)Jianjian ShenCongtong Zhang (2 patents)Jianjian ShenYue Wang (1 patent)Jianjian ShenWenjing Niu (1 patent)Jianjian ShenShanzong Li (1 patent)Jianjian ShenNannan Zhang (1 patent)Jianjian ShenSen Wang (1 patent)Jianjian ShenQianqian Shen (1 patent)Jianjian ShenLifei Sun (1 patent)Jianjian ShenChengguo Su (1 patent)Jianjian ShenRui Cao (1 patent)Jianjian ShenBinbin Zhou (1 patent)Jianjian ShenGuangze Chen (1 patent)Jianjian ShenJuntao Zhang (1 patent)Jianjian ShenLin Hu (1 patent)Jianjian ShenJianjian Shen (6 patents)Chuntian ChengChuntian Cheng (6 patents)Congtong ZhangCongtong Zhang (2 patents)Yue WangYue Wang (2 patents)Wenjing NiuWenjing Niu (1 patent)Shanzong LiShanzong Li (1 patent)Nannan ZhangNannan Zhang (1 patent)Sen WangSen Wang (1 patent)Qianqian ShenQianqian Shen (1 patent)Lifei SunLifei Sun (1 patent)Chengguo SuChengguo Su (1 patent)Rui CaoRui Cao (1 patent)Binbin ZhouBinbin Zhou (1 patent)Guangze ChenGuangze Chen (1 patent)Juntao ZhangJuntao Zhang (1 patent)Lin HuLin Hu (1 patent)
..
Inventor’s number of patents
..
Strength of working relationships

Company Filing History:

1. Dalian University of Technology (6 from 522 patents)


6 patents:

1. 12199442 - Method for quantification of flexibility requirements and coordinated optimization of a hydro-wind-solar multi-energy complementary systems

2. 11221594 - Practical method for short-term operations of super large-scale hydropower plants

3. 11188933 - Multi-objective optimization method for power system peak-shaving based on index linkage analysis

4. 11009001 - Method for multi-objective optimal operations of cascade hydropower plants based on relative target proximity and marginal analysis principle

5. 10825113 - Method for short-term generation scheduling of cascade hydropower plants coupling cluster analysis and decision tree

6. 10534327 - Method for long-term optimal operations of interprovincial hydropower system considering peak-shaving demands

Please report any incorrect information to support@idiyas.com
idiyas.com
as of
1/7/2026
Loading…