Growing community of inventors

Dalian, China

Chuntian Cheng

Average Co-Inventor Count = 4.39

ph-index = 1

The patent ph-index is calculated by counting the number of publications for which an author has been cited by other authors at least that same number of times.

Forward Citations = 0

Chuntian ChengJianjian Shen (6 patents)Chuntian ChengCongtong Zhang (2 patents)Chuntian ChengYue Wang (1 patent)Chuntian ChengWenjing Niu (1 patent)Chuntian ChengJuntao Zhang (1 patent)Chuntian ChengSen Wang (1 patent)Chuntian ChengQianqian Shen (1 patent)Chuntian ChengShanzong Li (1 patent)Chuntian ChengNannan Zhang (1 patent)Chuntian ChengLifei Sun (1 patent)Chuntian ChengChengguo Su (1 patent)Chuntian ChengRui Cao (1 patent)Chuntian ChengGuangze Chen (1 patent)Chuntian ChengBinbin Zhou (1 patent)Chuntian ChengLin Hu (1 patent)Chuntian ChengChuntian Cheng (6 patents)Jianjian ShenJianjian Shen (6 patents)Congtong ZhangCongtong Zhang (2 patents)Yue WangYue Wang (2 patents)Wenjing NiuWenjing Niu (1 patent)Juntao ZhangJuntao Zhang (1 patent)Sen WangSen Wang (1 patent)Qianqian ShenQianqian Shen (1 patent)Shanzong LiShanzong Li (1 patent)Nannan ZhangNannan Zhang (1 patent)Lifei SunLifei Sun (1 patent)Chengguo SuChengguo Su (1 patent)Rui CaoRui Cao (1 patent)Guangze ChenGuangze Chen (1 patent)Binbin ZhouBinbin Zhou (1 patent)Lin HuLin Hu (1 patent)
..
Inventor’s number of patents
..
Strength of working relationships

Company Filing History:

1. Dalian University of Technology (6 from 522 patents)


6 patents:

1. 12199442 - Method for quantification of flexibility requirements and coordinated optimization of a hydro-wind-solar multi-energy complementary systems

2. 11221594 - Practical method for short-term operations of super large-scale hydropower plants

3. 11188933 - Multi-objective optimization method for power system peak-shaving based on index linkage analysis

4. 11009001 - Method for multi-objective optimal operations of cascade hydropower plants based on relative target proximity and marginal analysis principle

5. 10825113 - Method for short-term generation scheduling of cascade hydropower plants coupling cluster analysis and decision tree

6. 10534327 - Method for long-term optimal operations of interprovincial hydropower system considering peak-shaving demands

Please report any incorrect information to support@idiyas.com
idiyas.com
as of
12/27/2025
Loading…